We're building a prefab nursery school in Milovice and Týnec nad Sázavou

Date: 21.7.2011
Milovice NS for 112 children and Týnec nad Sázavou NS for 50 children.

Milovice Prefab Nursery School for 112 Children

Construction of the Milovice – Mladá Nursery School has been going on since the beginning of June, and will be open for children on 1 September 2011. The new nursery school, built using the WAREX system, was designed for up to 112 (4x28) children, and has a total footprint of 1059 m2. The new building consists of two rectangular pavilions connected by a central part. Both parts are L-shaped, and thus enclose a protected green area for children's outdoor activities. Each pavilion is conceived as a building for two groups (two day rooms) of 28. The building height up to the parapet is 4.2 m. The new building is a single-story building. Both pavilions have independent entrances. Construction of a NS for 112 children in Milovice.

WAREX System Nursery School for 50 Children in Týnec nad Sázavou

Expansion of the existing nursery school in Týnec nad Sázavou by a pavilion for 50 children has been accomplished through a detached pavilion with a footprint of 431.9 m2. The new nursery school is a one-storey flat-roofed building. The day room looks southeast through a glass façade. The framing system is a WAREX system steel skeleton. Load-bearing columns are connected with steel truss girders. Windows and exterior doors are plastic, with triple glazing. Prefab nursery school construction in Týnec nad Sázavou.

Photo Gallery

 

Would you like more information?

Ask for an offer Download catalogue Browse catalogue
Prague head office
   +420 234 720 308
Prefab buildings - Prague
   +420 234 720 311, 312
Steel frames - Jeseník
   +420 584 411 884, 939
Manufacturing plant - Javorník
   +420 584 440 216
Contact

Warex news

24.2.2012

Kindergarten for 25 children approved for use in Mratín

Assembled kindergarten system WAREX open.
1.2.2012

Mounted in the extension of the kindergarten was opened Borovany

Borovany have a new pavilion for 25 kindergarten children.
29.12.2011

Operating Beroun Golf Resort building completed

The structural system consists of a steel building skeleton ...

news archive