Accommodation facility for sports centre Horní Počaply

Date: 27.6.2016
picture
The accommodation building, overall size 32,426 x 13,273 m, is located in a sports centre near a football pitch in Horní Počaply municipality. It will be used mainly as an accommodation with ...

The accommodation building, overall size 32,426 x 13,273 m, is located in a sports centre near a football pitch in Horní Počaply municipality. It will be used mainly as an accommodation with the general capacity of 40 persons in twin bedrooms.

The object separated in the middle by a brick firewall into two operationally independent parts. In each of them are ten twin bedrooms with necessary sanitary and technical facilities. The sanitary rooms in the left part are in-built in each room, in the right part the sanitary rooms are shared.

The right part is going to be used by sport clubs for year-round (mainly summer) training camps, the second one provides the accommodation for tourists who spend active holidays at 40 km of bike routes built nearby. 

Of course we keep in mind spaces for necessary storage spaces (bedclothes, cleaning agents etc.) as well as the wheelchair access, sanitary rooms and rooms designed specifically for disabled.  

Both parts consist of a set of steel containers with a supporting steel frame. The outer walls, roof and floor are made of combination of various materials – sandwich construction composed of a galvanized sheet, mineral wool, vapour barrier, laminated particle boards and PVC.

At the realisation of this construction, all WAREX company divisions cooperated – General Supplies and Steel Structures (preparation of the work, site assembly, communication with the investor, conduction of supervisory days at the building site, guarantee of legally trouble-free course of construction commissioning – participation at final building approval proceedings...), Production Plant (manufacture of containers and individual parts according to the investor’s requirements...) and Assembly and Shipping Plant (assembly of individual parts of the specific containers before they are shipped to the general assembly site...).

Thanks to this technology and working procedure we are trying to minimise the environmental pollution at the final assembly site. The whole process form the manufacture till the handover took very short time (13. 4. – 23. 5. 2016), the individual site assembly took only 3 days.

We should not forget to mention the construction of central heating system and operation of heat exchanger station inside one of the containers. This solution was chosen by one of the investors due to the accessibility of a cheap hot water supply.

On 6/7/2016, the final works will come to an end and the building will be handed over with the participation of the Mayor, municipal representatives and Building Authority deputy. Then the equipment of the rooms will begin. For August we plan a ceremonial opening of the accommodation facility.

 

Would you like more information?

Ask for an offer

Headquarters
   +420 234 720 308
General Supplies and Steel Structures
   +420 234 720 308
Residential containers
   +420 234 720 308
Production of steel construction
   +420 584 411 884; +420 731 663 536
Contact

News

12.5.2017

WAREX Ltd. for HOCHTIEF CZ a.s.

Roof construction for the extension of the hall trusses with a ...
8.2.2017

Delivery of trusses.

62 tons trusses in Germany
20.1.2017

Steel structure hall in Tabor

Delivery of 178.000 kg of steel structures for the construction ...

news archive