Construction of temporary office space from containers - C2

Date: 9.12.2016
WAREX Ltd. realized part of the planned construction of the extent th 1st and the 2nd floor. Currently is under construction the 3rd floor.

For Continental Automotive Czech Republic we realized in Brandys nad Labem construction of temporary office space from containers. It is a building of three floors with a built area of 645 m2.

Capacity Building:
1st floor 518 m2 office areas, ie. 64 jobs
2nd floor 354 m2 office areas, ie. 44 jobs
◦163 m2 of meeting rooms + 12,8 m2 kitchen and living room
3rd floor 503 m2 office areas, ie. 62 jobs
◦12,8 m2 kitchen and living room

The total room occupancy: 170 persons

The building are:
entrance vestibule and hallway
• Main and emergency staircases
Sanitary facilities (toilets, bathrooms, utility rooms)

Construction will be completed in 01/2017 and supply price consists of the lump sum payment for installation and monthly rent.

 

Would you like more information?

Ask for an offer

Headquarters
   +420 234 720 308
General Supplies and Steel Structures
   +420 234 720 308
Residential containers
   +420 234 720 308
Production of steel construction
   +420 584 411 884; +420 731 663 536
Contact

News

12.5.2017

WAREX Ltd. for HOCHTIEF CZ a.s.

Roof construction for the extension of the hall trusses with a ...

news archive